[edit] Background
The concept of the 'Golden Thread' was coined by Dame Judith Hackitt in her 'Golden Thread Report'. The term was utilised in many educational BIM seminars, and it's meaning has since evolved through interpretation within the BIM industry.
For any project delivered using BIM software, standards and processes, there is a recognised need to 'weave' or integrate the processes and deliverables for each project data contributor's exchange data, across all project stages. This it the driver behind the development of a legible integrated and interactive multifaceted matrix.
The resulting framework that supports this outcome is the 'Golden Matrix', which expands upon the original concept of the 'Golden Thread'. The term 'matrix' relates to the organised arrangement of interrelated processes and data deliverables, allowing for planning and monitoring of successful outcomes over the cycle from authoring to delivery.
[edit] Concept
"Golden Matrix" describes the scenario whereby the process from inception at Tier 1/ultimate client, to occupying tenant or landlord, is planned and delivered via a proven agreed and managed system of protocols, standards, models and data derived from 'Endo-BIM sources, which is handed over at the operations phase. The handover data set is then integrated in to O&M Manuals or CAFM software systems.
The handover data set is developed by each of the project contributors listed in the BIM Execution Plan. The project data contributors are typically:
- Lead Designer
- Task Teams
- Professional consultants
- Suppliers
- Installing/commissioning personnel
- Operations phase maintenance personnel
[edit] Process
To successfully achieve an implementable handover data set for the operations phase of a project delivered using BIM software, there is a need for:
- Proven precedent project studies
- Robust standards useable by all contributors
- Interim Information Management processes to confirm protocols are being implemented correctly
- BIM Coordination meetings to feedback to Project Data Contributors
- Knowledge of intended CAFM/O&M system that will receive the handover data set
[edit] Principles
Expanding upon the principles for the 'Golden Thread' to a 'Golden Matrix' was necessary to accommodate the overall interconnected process that defines, manages and captures the whole handover project data in an organised and deliverable set of formatted and auditable volumes.
The handover data-set must be developed within overarching protocols and processes to deliver data that is:
- Derived from Endo-BIM sources
- From a single data source e.g. project CDE
- Accurate trusted truthful and verified
- Has an audit path back to the data author
- Authored in an Open File Format
- Compliant with standardised schemas
[edit] Related articles on Designing Buildings
- Building Safety Regulator.
- Building information modelling BIM.
- BIM protocol
- CDM.
- Duty holder.
- Digital twin.
- Fire.
- Golden Thread.
- Golden Thread report published by CIOB and i3PT..
- Grenfell articles.
- Hackitt review of the building regulations and fire safety, final report.
- Information Rejection.
- The golden thread and BS 8644-1.
[edit] References
See below:
Building Regulations Advisory Committee: golden thread report - GOV.UK (www.gov.uk)
https://www.thenbs.com/knowledge/what-is-the-golden-thread
D30-D5.2-Second-Report-on-CEN-existing-standards.pdf (net-ubiep.eu)
D29-D5.1-First-report-on-CEN-existing-standards.pdf (net-ubiep.eu)
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.